# AI first 90 days project plan

Business: [Business name]
Plan owner: [Full name, role]
Executive sponsor: [Full name, role]
Date plan agreed: [YYYY-MM-DD]

## How to use this file

1. Answer every bracketed field before any build starts.
2. Replace the sample rows with the workflow you have selected.
3. Review the plan at each phase gate. Keep the decision log beside it.
4. If a row has no named owner, that row is not ready.

## One-page summary

### Objective

[One business objective in the owner's words. No tooling in this sentence.]

### Measure

[The number or observed outcome that changes, with its baseline and how it will be checked.]

### Scope

[The smallest testable version of the selected workflow.]

### Explicit exclusions

- [Consequential action excluded from the first release.]
- [Outbound customer communication or financial change excluded.]
- [Department, record class or integration excluded.]

### First gate

Roll out if [objective measure or condition]. Revise if [condition that changes scope]. Stop if [condition that disproves the assumption].

## Sources and access

| Source system | Records included | Records withheld | Owner | Access status | Note |
| --- | --- | --- | --- | --- | --- |
| [CRM] | [Object and fields] | [Restricted histories] | [Name] | [Approved / denied / pending] | [Date checked] |
| [Document store] | [Approved collections] | [Drafts or older versions] | [Name] | [Approved / denied / pending] | [Date checked] |
| [Help desk] | [Ticket history] | [Personal or commercial restrictions] | [Name] | [Approved / denied / pending] | [Date checked] |

## Owners

| Role | Name | Monday work | Recovery or rollback duty |
| --- | --- | --- | --- |
| Plan owner | [Name] | Keep plan and decisions current | Stop a phase and record why |
| Workflow owner | [Name] | Supply examples and own the measure | Revert to existing process using written steps |
| Systems owner | [Name] | Approve access and read boundaries | Revoke access and preserve audit trail |
| Executive sponsor | [Name] | Approve or stop next phase | Cancel unfunded work and protect team time |

## Acceptance tests

| Test | Expected behavior | Owner | Evidence required |
| --- | --- | --- | --- |
| Stale record | Stop or mark as stale, never present a confident answer from an outdated record | [Name] | Source date and comparison |
| Missing record | Say what is missing, then create an owner task | [Name] | Recorded gap |
| Withheld record | Respect permissions and state the limitation | [Name] | Access boundary |
| Conflicting records | Send the conflict to the named owner, do not resolve automatically | [Name] | Owner review |
| Failed connection | Pause affected steps and use the documented fallback | [Name] | Monitoring or incident note |
| Human approval | Keep consequential actions behind named approval | [Name] | Approval record |

## 90-day schedule

| Week | Work | Owner | Evidence | Gate outcome |
| --- | --- | --- | --- | --- |
| 1 | Interview five people; follow two live examples including calls, files, approvals and follow-ups | [Name] | Volume, cycle time and record gaps | |
| 2 | Inventory sources, permissions and integrations | [Name] | Source list and access results | |
| 3 | Score five workflows for impact, effort, risk and evidence | [Name] | Scorecard and shortlist | |
| 4 | Synthesize design: objective, exclusions, source boundaries, approvals and cost assumptions | [Name] | Signed scope | Roll out / revise / stop |
| 5 | Write acceptance tests with incorrect, missing, withheld and conflicting records | [Name] | Test list | |
| 6-7 | Build the smallest testable version and run tests | [Name] | Results and failure notes | |
| 8 | Review the test with staff and decide | [Sponsor] | Decision record | Roll out / revise / stop |
| 9-10 | Integrate approved connections, permissions, logging and rollback | [Name] | Access matrix and rollback steps | |
| 11 | Train the team and require one independent attempt | [Name] | Training evidence | |
| 12 | Review adoption, cycle time, errors and feedback | [Name] | Outcome against criteria | Roll out / revise / stop |

## Failure modes and controls

| Failure mode | Control | Owner |
| --- | --- | --- |
| Stale records | Record source dates and define the explicit gap response | [Name] |
| Denied or changing access | Use an access request, read boundary and revocation step | [Name] |
| Failed connections | Monitor, pause output and use the documented fallback | [Name] |
| API changes | Version the integration, test upgrades and keep rollback notes | [Name] |
| Undocumented scope | Keep exclusions, assumptions and next review in the decision log | [Name] |

## Assumptions and risks

| Assumption or risk | Impact if wrong | Action | Review date |
| --- | --- | --- | --- |
| [Source data is current] | [Test produces misleading drafts] | [Check dates and compare records] | [YYYY-MM-DD] |
| [Named staff have time] | [Tests and training are late] | [Protect hours and track blockers] | [YYYY-MM-DD] |
| [Integration is approved] | [Production build cannot start] | [Complete access request] | [YYYY-MM-DD] |

## When this plan is not needed

A 90-day plan is unnecessary when the task is a single low risk asset with one owner, when an existing vendor already solves the workflow, or when no source data is involved. Use the vendor's tool, record the decision, and keep the work short. This plan is for work where several systems, teams or risks meet.